Work on Monday, June 20, 2011
Mid-morning
another truckload of sandy loam arrives as planter soil for behind the
wall. |
|
A
sock-covered perforated pipe has been placed behind the seating/retainer
wall. |
|
Tom shovels pea gravel over the pipe
as part of the drainage system. |
|
Tom shovels pea gravel from the
tractor bucket into a round bucket held by Brandon. |
|
Brandon continues pouring pea gravel
over the perforated drainage collection flex pipe. |
|
Connection of collection pipe to a
flex pipe that extends along the walkway and to the next-to-bottom stair
to the dock. |
|
Light fixture box in the
seating/retainer wall |
|
Brandon hauls in sandy loam and
places it behind the retainer wall. |
|
Tom inspects backfill progress and
estimates the number of tractor bucketfuls needed to fill the area. |
|